Challenge
The hub connects the wind turbine blades to the rotor assembly.
At approximately 6 × 6 × 5.5 metres and 90 tonnes before machining, this SG14 component required specialised equipment and extensive experience handling and machining very large wind-industry parts.
Nordmark’s role
Nordmark machined the SG14 wind turbine hub from approximately 90 tonnes as received to 77 tonnes after machining.
Handling a component of this size required specialised machining capacity and extensive experience with large wind turbine components.
Notable facts and numbers
Customer value
The machining work converted a large unfinished hub into a component ready for subsequent steps in the supply chain. For wind-industry partners, Nordmark’s experience helps bridge the gap between component design and practical, verifiable manufacturing at scale.